Get updates from The Developer straight to your inbox Yes, please!
Anthropologist Caroline Bennett speaks to locals with photography by John Sturrock
Mega-events have "monumental ephemerality", according to archaeologist Rebecca Graf. Recent Olympic and Paralympic Games have, however, tried to move beyond the momentary to a lasting legacy. Indeed, the importance of legacy is written into the Olympic Charter. What that legacy means has varied through time but, since the 1960s Rome Olympics, event-led regeneration has been a central driving force for many such mega-events.
The overall plan for the London 2012 Olympic Park was to redevelop a large area of the Lower Lea Valley and make the area into "the new heart of east London", adopting spatial principles to create thriving neighbourhoods, connected to each other and stitched into pre-existing communities, mixing living, industry and leisure, and centred around the waterways in the valley.
The aim was not only to bring much-needed investment to the four deprived London boroughs - Hackney, Newham, Tower Hamlets and Waltham Forest - that the Olympic site straddled, but to completely transform the area as well. As such, the London Olympic bid positioned regeneration as its driving motivation, declaring that the Games would deliver prosperity to the East End and London as a whole.
"This project is about not only delivering great quality housing, of which there is much more to come, but creating a new part of the city that includes significant infrastructure, economic growth and health and wellbeing"
The vision, delivered by the London Legacy Development Corporation (LLDC) was to create a "total social legacy" and the park is broadly successful. At over 225 hectares, the Olympic area is vast, including green spaces, waterways, housing, leisure facilities and infrastructure projects. The East Village and Chobham Manor are residential areas, housing families and young professionals working for companies such as Google and Meta.
The East Bank is home to arts and cultural institutions including V&A East, Sadler’s Wells East and BBC Music studios. When workplaces started reopening after the Covid-19 lockdowns, the Care Quality Commission moved its offices to Stratford from its previous location in Old Street. HMRC and the Human Tissue Authority have offices there. Here East houses creative, technological and business incubators as well as long established firms. Universities, too, are moving in. Loughborough has a London campus within the Olympic Park, and there are new buildings for University College London’s UCL East campus and the UAL London College of Fashion.
The area retains some industry. It was once home to 280 businesses employing 5,000 people in various trades but, according to research by Professor Julia Davis, these were relocated before the Games, and many closed down. The site still has concrete and aggregate plants, owned and run by Network Rail. Although it is seeking planning to develop leisure and business facilities, it aims to keep the railhead running too. Workspaces, maker spaces and start-up incubators have been added to the park.
According to The Guardian, research by Dr Penny Bernstock reveals that the net gain is just 110 genuinely affordable homes
Over 12,000 homes have been built with the stated aim of 30 per cent being affordable housing. Yet social housing makes up less than 10 percent of the total homes – approximately 1,000 units have been delivered. These are small numbers given the early promise that 30,000 to 40,000 new homes would be built, much of it affordable and for key workers. And especially given that the Clays Lane estate, which had 450 low-cost tenancies, was emptied and demolished to make way for Olympic development.
According to The Guardian, research by Dr Penny Bernstock reveals that the net gain is just 110 genuinely affordable homes. Meanwhile, in the four boroughs there are nearly 75,000 households on the waiting list for council homes. Private rental and housing prices have increased and the "affordable" rental housing in the East Village has a minimum income threshold of £48,000 for a one-bed flat while shared ownership homes require an annual income of at least £60,000.
In response, an LLDC spokesperson says: "Our record on housing delivery compares well to any other regeneration scheme in the capital and beyond. All our housing is in line with national and regional policies for affordable housing provision, but like the rest of London there are real challenges about truly affordable social rent homes; Queen Elizabeth Olympic Park is no different. This project is about not only delivering great quality housing, of which there is much more to come, but creating a new part of the city that includes significant infrastructure, economic growth and health and wellbeing."
The LLDC has written that some 33,000 new homes will be built in the area by 2036, almost 35 per cent of them affordable. "That’s over 11,000 new affordable homes in a range of tenures"
Register for free below to continue reading our independant journalism. Don't forget to sign up to our newsletter to receive updates from The Developer straight to your inbox.
It's thanks to our proud supporters that we are able to publish and commission campaigning journalism and podcasts, so why not enquire about how you can support our work with james@thedeveloper.live or check out Organsiation Membership.
Get updates from The Developer straight to your inbox
Thanks to our organisation members
© Festival of Place - Tweak Ltd., 124 City Road, London, EC1V 2NX. Tel: 020 3326 7238